Tyler's House of Horrors

My adventures in home renovation

Friday, February 1, 2013

Hallway Sub Floor

The tiles came up really easy but with the newspaper, fabric and tar paper under the plywood it made for a long clean up

Posted by T-Machine at 1:44 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2014 (18)
    • ►  March (18)
  • ▼  2013 (229)
    • ►  June (27)
    • ►  April (40)
    • ►  March (64)
    • ▼  February (31)
      • Attic Mess
      • Piles of crap
      • More piles of crap
      • I swear if I have to throw one more fucking mattre...
      • Top 3 Random Attic Items
      • Creepy Ass Picture
      • Unicorns!!!
      • Dumpster #3
      • All finished
      • Demo Mission Success
      • Kitchen Ceiling
      • Surprise #1
      • Surprise #2
      • Attic
      • I managed to clean up all the boards and sheetrock...
      • I had my fill with the kitchen for the day so I pu...
      • Poor Shed/Urinal
      • Bedroom Tile
      • Masonite
      • It goes a lot easier when the tiles come off in on...
      • Sucess
      • Hallway Sub Floor
      • Newspaper
      • Hallway Sub Floor
      • Mystery Hole #2
      • The flooring came up a lot easier in the downstair...
      • Sub Floor
      • Hallway Sub Floor
      • Sub Floor
    • ►  January (67)
  • ►  2012 (18)
    • ►  December (6)
    • ►  November (12)
Simple theme. Powered by Blogger.