So my goal this April was pretty lofty. By the end of the month I wanted to get the power hooked up, remove the downstairs wall between the living room and kitchen and put the subfloor down upstairs and downstairs. Now the the month is over I can look back and say that it was a pretty big success. We got done everything on our list except we are only 3/4 done with the upstairs subfloor. On top of that we also had the shed in backyard removed. Not too shabby at all I don't think.
No comments:
Post a Comment